Lesson plan: Risk Assessment
AP Cybersecurity · Unit 2 Securing Spaces · Topic 2.1 Cyber Foundations · Practice set
At a glance
- Suggested time
- 2 class periods (45 min)
- Pacing
- Fourth of six sets for Topic 2.1. The CED gives Topic 2.1 eight class periods; this plan suggests 1 for Social Engineering Tactics, 1 for Adversaries and Their Motivations, 1 for Phases of a Cyberattack, 2 for this set, 2 for Managing Risk and Defense in Depth, and 1 for Classifying Security Controls. The process taught here comes back in Rating Physical Risk, where students rate the risks of a building.
- Before this set
- Adversaries and Their Motivations (who attacks and why, including hobbyists running downloaded tools and hacktivists) and Phases of a Cyberattack (initial access and a foothold, used in Problem 14 🔒). Students should know the words threat and vulnerability from Introduction to Security.
- Skills
- 1.C Evaluate, with and without the support of AI, the likelihood and impact of risks.1.D Document, with and without the support of AI, the likelihood and impact of risks.
The one idea: A risk is a threat that can exploit a vulnerability to compromise an asset. Each risk is weighed on two separate factors, how likely an attack on that vulnerability is and how much damage it would do, and the written entry records both before giving a final rating in numbers or in words.
Day by day
Day 1 · Likelihood and severity45 min
- Open (5 min)Ask for one thing in this school worth protecting, one weakness it has, and who or what could use that weakness. Write the answers in three unlabeled columns on the board. The CED's unit notes suggest starting from spaces students know, like their school.
- Mini-lesson (15 min)Teach Risk Assessment, from the start through the end of "A holiday takeover": the Equifax timeline, the board-game company's assets, its two risks, likelihood, and severity. The lesson asks students to guess the largest cost before the bar chart; take the guesses. Then label the board columns asset, vulnerability, and threat.
- Do together (5 min)Problem 3 🔒 🔒 Teacher notes: sign in as a teacher to see this🔒 Teacher notes: open the full plan to see this
- On their own (8 min)Problem 1 🔒 Problem 2 🔒: name the likelihood factor · Problem 4 🔒: what goes into severity.
- Do together (7 min)Problem 13 🔒 🔒 Teacher notes: sign in as a teacher to see this🔒 Teacher notes: open the full plan to see this
- Exit check (5 min)🔒 Teacher notes: sign in as a teacher to see this🔒 Teacher notes: open the full plan to see this
Day 2 · Rating and writing it down45 min
- Mini-lesson (10 min)Teach Risk Assessment, from "Rating the risks" through "The documentation entry": risk A in dollars a year, risk B in words, the demo copies, and the five-row entry for risk B. Assign "The cost to Equifax" as reading; the items do not need it.
- Do together (5 min)Problem 6 🔒 🔒 Teacher notes: sign in as a teacher to see this🔒 Teacher notes: open the full plan to see this
- On their own (8 min)Problem 5 🔒: what a quantitative result is · Problem 7 🔒: the CED's four-band scale · Problem 14 🔒: find the moderate finding against the three bands the stem prints, the CED's 2.2.C bands. Tell students to rate every choice against the bands before picking one. Rating Physical Risk teaches the bands in full.
- In pairs (12 min)Problem 8 🔒 first (the five elements), then Problem 9 🔒 Problem 10 🔒 Problem 11 🔒 Problem 12 🔒: one student reads the line, the other names the element and points to the words that decide it.
- Discuss (7 min)Problem 11 🔒 Problem 14 🔒 🔒 Teacher notes: sign in as a teacher to see this🔒 Teacher notes: open the full plan to see this
- Wrap (3 min)Students write the five documentation elements from memory, then check them against the lesson's table for risk B.
Differentiation
- If students are struggling
- Hand out a two-column card, Likelihood and Severity, and have students sort each fact in the stem into a column before choosing on Problem 2 🔒, Problem 4 🔒, Problem 7 🔒, and Problem 13 🔒. For Problem 9 🔒 to Problem 12 🔒, keep the lesson's documentation table for risk B open.
- Extension
- Write the full five-row entry for risk A, which the lesson only sketches (it gives the threats row and the rating). Or pick a space in the school, such as the library or the front office, and rate one of its risks both ways: in words, and in dollars a year.
- Vocabulary support
- asset, threat, vulnerability, risk, exploit, likelihood, severity, quantitative and qualitative, foothold, risk register (the items' name for the written assessment).
From the course framework
LO 2.1.D Describe the risk assessment process.
- 2.1.D.1 Risk occurs when a threat can exploit a vulnerability to compromise an asset.
- 2.1.D.2 An asset is anything valuable. Assets include financial resources, intellectual property, data, digital infrastructure, physical property, and reputation.
- 2.1.D.3 Risk assessment considers two factors: - The likelihood of an attack against a specific vulnerability - The severity of the projected damage from an attack against a specific vulnerability
- 2.1.D.4 The likelihood of a vulnerability being exploited depends on many factors, including: - The value of the target: Adversaries are more likely to attack targets they perceive as valuable. - The level of skill required to exploit the vulnerability (i.e., the difficulty): Vulnerabilities with well-documented exploits often require less skill and can be carried out by more adversaries. - The motivation and capabilities of likely adversaries: Highly motivated and skilled adversaries are more likely to be able to perform more complex exploits.
- 2.1.D.5 The severity of an attack is often measured by financial cost, which can also include reputational and operational impacts.
- 2.1.D.6 The result of a risk assessment can be quantitative or qualitative. - Quantitative risk assessment assigns a numeric value to a vulnerability based on a numeric scale (e.g., 1 to 10) or quantifiable impact, which could be financial (e.g., a $10,000 annual risk).
- 2.1.D.7 Risk assessment documentation should include: - Vulnerable assets and their value - Descriptions of likely threats to the assets - Details of specific vulnerabilities for specific assets and how they would be exploited - An explanation of the severity of damage (financial, operational, reputational, etc.) if a specific asset were compromised, and the likelihood of that compromise occurring - A final rating, quantitative or qualitative, for each risk identified
LO 2.2.C Assess and document risks from physical vulnerabilities.
- 2.2.C.3 Moderate risks from physical vulnerabilities arise when a noncritical or nonsensitive part of an organization is left unprotected in a way that it could act as a foothold for an adversary to gain initial access to other resources.
Framework example: The hacktivist (after 2.1.D.5): a hacktivist who opposes the illegal fishing a local food production company supports sees the company's main webpage as a high-value target. Defacing it brings the adversary no money but raises awareness of the cause. Rating scales (2.1.D.6 and 2.1.D.7): low, medium, high, severe; unlikely low impact, likely low impact, unlikely high impact, likely high impact; a scaled score from 1 to 10; a monetary value, such as a 10,000-dollar risk against a 100,000-dollar risk.